With the block getting new sleeves and pistons it was decided to get a new valve train too

The manifold mating surface had eroded away on the front exhaust port, nicely resurfaced

Resurfaced and with new guides, valves, springs, and keepers

The seats ground and valves lapped it is ready

I got to use the hone on the rods so no shims should be required

The cleaned up conditioned rods are attached to the pistons according to the service manual

The ring gap is verified on all the new rings

The Pistons in and rod bolts torqued and wired, it's ready for the sump

Oil pan in place

The end gaskets have been wrapped around a spray paint can for a few weeks so they had a nice curve

The view from the top

The push rod cover plate is back on

With the head back on it is starting to take shape

The temp got up to 50 that's warm for December. But I got the outdoor paint booth open long enough for this

Looks good in the December sunshine

Next
Back
Home